Thanks to our experience of more than 40 years in the implementation of successful aeration projects and more than 1000 equipped systems, we have been able to build up extensive know-how in almost all areas of wastewater aeration. See for yourself!

Energy Efficiency

Optimization of energy consumption and process technology of the biological stage of the WWTP Aachen Soers

System Size: 458.000 EW
Realization: 2018

Download pdf

WWTP Aachen Soers

Optimization of energy consumption and process technology of the biological stage of the WWTP Aachen Soers

System Size: 458.000 EW
Realization: 2018

Download pdf

WWTP Aachen Soers

The use of the new aeration panels MESSNER® Compact from RMU AG supplies the large WWTP Wuppertal Buchenhofen reliably and efficiently with oxygen

System Size: 600.000 EW
Realization: 2015

Download pdf

WWTP Buchenhofen

High energy savings and improved discharge value through the combination of process change to Tube Flow Technology®, a new control concept and the use of the MESSNER® Aeration Panel.

System size: 210.000 PE
Realization: March - November 2008

Download pdf

WWTP Kaiserslautern

Change into Plug Flow Technology with full floor aeration by RMU AG

System size: 30.000 PE
Realization: September 2017

Download pdf

WWTP Oberschleißheim


Process Optimization / Control System

47% energy savings by energy efficiency optimisation of the biological waste water treatment with MESSNER® Aeration Panels.

System size: 25.000 PE
Realization: July 2012

Download pdf

WWTP Adelsdorf

47% energy savings by energy efficiency optimisation of the biological waste water treatment with MESSNER® Aeration Panels.

System size: 25.000 PE
Realization: July 2012

Download pdf

WWTP Adelsdorf

37% reduction of flocking agent and increase of operating safety by implementing the RMU controlling system together with the proved MESSNER® Aeration Panel.

System size: 70.000 PE
Realization: October 2015

Download pdf

WWTP Nördlingen

Complete process optimization of the biological cleaning stage by RMU AG

System Size: 200.000 EW
Realization: 2016/2017

Download pdf

WWTP Schweinfurt

RMU Plug Flow Technology® leads to 47% energy cost saving and increased operating safety.

System size: 90.000 PE
Realization: October 2015

Download pdf

WWTP Emden

Refurbished Schreiber Plants

Successful conversion of a SCHREIBER Aeration Tank.

System size: 9.980 PE
Realization: September 1999

Download pdf

WWTP Bad Münster

Successful conversion of a SCHREIBER Aeration Tank.

System size: 9.980 PE
Realization: September 1999

Download pdf

WWTP Bad Münster

58% energy saving and effluent values for total nitrogen under 5 mg/l after installation of the MESSNER Aeration Panel®.

System size: 18.000 PE
Realization: April 2015

Download pdf

WWTP Oberhoppen

Industrial Wastewater Plants

Biological treatment of liquid hazardous waste!

Duration: December 2014

Download pdf

WWTP Lindenschmidt

Biological treatment of liquid hazardous waste!

Duration: December 2014

Download pdf

WWTP Lindenschmidt

From indirect to direct discharger by running an own treatment plant

Duration: March 2017

Download pdf

WWTP Ten Kate

Liftable Solutions

Switch from surface aeration to fine bubble aeration without disrupting operations.

System size: 19.000 PE
Realization: September 2014

Download pdf

WWTP Eggolsheim

Switch from surface aeration to fine bubble aeration without disrupting operations.

System size: 19.000 PE
Realization: September 2014

Download pdf

WWTP Eggolsheim

MESSNER® Aeration Panels – the most economical solution for efficient pure oxygen aeration.

System size: 29.000 PE
Realization: Mai 2017

Download pdf

WWTP Kneese

Pure Oxygen Aeration

MESSNER® Aeration Panels – the most economical solution for efficient pure oxygen aeration.

System size: 29.000 PE
Realization: Mai 2017

Download pdf

WWTP Kneese

MESSNER® Aeration Panels – the most economical solution for efficient pure oxygen aeration.

System size: 29.000 PE
Realization: Mai 2017

Download pdf